Finally, our kitchen remodel is finished. We still need to install and work on some minor items. I don't know if any of you know this is our second remodel of this kitchen in 9 years. These are photos of this kitchen's history-Before and After.
BEFORE Spring 2003
-Before we even made an offer on this house, our realtor thought we were kidding considering this crazy looking house:) These first few pictures are from before we moved in.-
2003-2011
-As soon as we got into this house, we ripped up the pink linoleum floor, and we installed tile. I had to scrub in and out of every single part of the cabinets, then I primed and painted. Oh, we did some trim work on the cabinet doors, and we changed all the hardware. We got a new stove, fridge, and overhead microwave.-
And NOW Winter 2012
2003-2011
NOW Winter 2012
2 comments:
もう、ここまで上手く仕上がると内装業者並みのテクニックですね~。凄い!
ありがとう。血統ですかね?(笑)
Post a Comment